Manufacturing & Laboratory Capabilities
Manufacturing & Laboratory Capabilities
|
|
Laboratory Capability
We have got following testing facilities in our own laboratory.
- K F Moisture Testing Equipment(semi-automatic)
- Melting Point / Boiling Point Testing Equipment
- Electronic / Mechanical Weighing Balance
- Digital pH Meter
- U.V.Spectrophotometer
- Gas Liquid Chromatography (G.L.C.)
- Titration unit attached to Potentiometer
- Viscometer (Bricks Meter)
- High Pressure Liquid Chromatography (H.P.L.C.)
- Automic Absorption Spectrophotometer (A.A.S.)
We also test our raw materials & use only standard one to avoid further problems in our finished products.
|
| S.No |
Machinery |
Capacity |
Number |
| 1 |
Glass line reactor with variable speed drive & anchor stirrer |
3.00 KL |
01 |
| 2 |
Glass line reactor with variable speed drive & anchor stirrer |
1.60 KL |
02 |
| 3 |
Glass line reactor with variable speed drive & propaler stirrer |
1.60 KL |
02 |
| 4 |
S. S. reactors (crystalliser) |
3.00 KL |
01 |
| 5 |
S. S. reactors |
1.60 KL |
03 |
| 6 |
S. S. reactors |
0.25 KL |
01 |
| 7 |
S. S. Agitated pressure nutch filter |
1.60 KL |
01 |
| 8 |
Rotocone vacuume dryer |
0.80 KL |
01 |
| 9 |
Rubberlined centrifuged |
36" |
02 |
| 10 |
Rubberlined centrifuged |
24" |
01 |
| 11 |
S. S.centrifuge |
24" |
04 |
| 12 |
S. S. pressure filter |
36" & 48" |
01 |
| 13 |
P.P.F.R.P.pressure filter |
2600 LTR |
01 |
| 14 |
Chilling Plant (-20 & -45°C) |
15 & 4.6 TR |
02 |
| 15 |
Cooling Tower |
60 TR |
02 |
| 16 |
Cooling Tower |
20 TR |
02 |
| 17 |
Oil Fire Boiler |
600 KG/HR |
02 |
| 18 |
Vacuume System (Steam Ejector) |
10 Torr. |
02 |
| 19 |
S.S.Storage tanks (underground,with explosive license for petroleum class "A") |
14.7 KL |
03 |
| 20 |
P.P.F.R.P. Vertical Storage Tanks |
14.0 KL |
02 |
| 21 |
M.S.Storage Tanks (underground,with explosive license for petroleum class"B") |
12.0 KL |
02 |
| 22 |
Full Fladge Effluent Treatment Plant |
20 KL/DAY |
02 |
| 23 |
P.P.F.R.P. Gas Scrubbers |
1000 LTR |
02 |
| 24 |
Sanctioned Power Load |
65HP(N-12) 67HP(N-13) |
- |
| 25 |
Generator (D.G.) |
140 KVA |
02 |
|
| |